See how we can keep your home safe, warm and working.

Get a quote

Bathroom Installation & Leak Repair for 2-Bed Terrace

We replaced a failing bathroom in a two-bed terrace for a letting agent. Our work included removing the old bath and tiles due to an irreparable leak, installing a new bath with waterproof tiling, fitting a glass shower screen, new taps, and a thermostatic shower.

Completed in 2 weeks
Fast turnaround for new tenant move-in
Fixed-price quote
Waterproof guarantee
Leak-free finish

From Urgent Leak to Tenant-Ready Bathroom

A letting agent needed a rapid, reliable bathroom replacement when a pre-existing leak proved beyond repair.

With a new tenant moving in, the rental property had to be leak-free and fully functioning on a tight deadline.

The agent trusted us from prior work, accepted our competitive quote, and relied on us to deliver on time.

The Client

A letting agent managing a residential two-bed terrace, referred by a satisfied property manager.

The Goal

Remove the damaged bath and tiles, repair underlying issues, and install a brand-new, fully waterproof bathroom ready for tenant occupancy within two weeks.

How We Did It

Step 1 — Inspection & Quotation

An engineer visited the property to assess the leak, measure the space, and confirm that the bath and tiles had to be replaced. We provided a detailed, fixed-price quote based on those findings.

Step 2 — Scheduling & Materials

Once the quote was approved, we scheduled the work to fit the landlord’s timeline and sourced all plumbing materials from Express Plumbing Supplies, ensuring quality and availability.

Step 3 — Preparation & Protection

Before removing anything, we protected floors and surfaces throughout the home. The water supply was isolated and drained down to prevent further damage.

The Work

First, we set up waste-disposal arrangements and removed the old bath, tiles, and damaged pipework. In discovering that the floor substrate was rotten, we discussed replacement options with the letting agent and landlord, then proceeded to strip out the old floor.

Preparation

We cordoned off the bathroom, installed dust sheets, and double-checked our materials and tools to ensure a smooth workflow once demolition began.

Installation
  • Removal & Drain-Down: Isolated and drained the water system, then removed the bath, tiles, and existing pipework.
  • Floor Replacement & Waterproofing: Replaced the rotten floor substrate, applied waterproof membrane, and prepared walls and floors for tiling.
  • Bath & Tile Installation: Fitted the new bath frame and panelling, laid waterproof tiles up to splash height, and sealed all joints.
  • Fixtures & Fittings: Installed a glass shower screen, new taps, and a thermostatic shower valve, ensuring all connections were leak-tested.
Finishing Touches

We completed grout and sealant work, performed final leak and pressure checks, cleaned up all debris, and removed protective coverings.

The Results

Delivered on schedule and fully leak-free, the new bathroom met the letting agent’s requirements for tenant move-in.

The landlord was delighted with the quality finish, prompt turnaround, and reliable waterproofing.